Robotic Total Station

“Just as a good foundation is the key to a good house, correct and accurate foundation layout is the key to a good foundation.” -- Barry Herbert, Founder and President of Herbert Construction Co.

Herbert Construction Co. was the first foundation contractor in the United States to lay out residential basement foundations with a robotic total station.  Today, 100% of the house foundations that we construct are laid out using one of our Robotic Total Station layout instruments. 

The typical method for laying out house foundations is with string lines, batter boards, and tape measures.  When the building lot has lots of topo this can be considerably more difficult to do.  This can lead to foundations that are misplaced on the lot, and with dimensions that do not match the framing plan. 

This causes many problems for you, the builder, such as:

  • Your time required to address the problem and come up with a solution
  • Variance requests by you to the zoning board for building setback or offset changes
  • Construction delays and building schedule problems
  • Changes to the first floor framing dimensions to match the foundation
  • Frustrated framing trades and possible back charges
  • Questions from the homeowner regarding modifications to the original plans

When we use one of our Robotic Total Station layout instruments to lay out your house foundation, the use of string lines, batter boards, and measuring tapes isn’t necessary.  This eliminates the inherent errors that occur while using these methods.

When we construct your house foundation, whether it is a walkout basement or deep beams, it will be dimensionally correct and square. 

To learn more about how we use technology to solve the problems home builders have with their basements and deep beam foundations, call Doug Herbert at 210-788-1598, or Contact Us.

Back to Tool & Equipment Page….



“Starting the house with a correct foundation is the most important part of the homebuilding process.  Herbert Construction Company’s technology ensures an accurate layout of my complex foundations.  I know that they will put in a high quality basement.”
Kyle Henry, Kyle V. Henry, Inc.

MVC-003S.JPG

“With Herbert Construction’s Geodimeter Layout instrument, they are not relying on men laying out the foundation with tapes, which accounts for many mistakes.  Because of this, we don’t lose time because a foundation out of square.”
Justin Linton, Builder, Laurel River Properties